| Marine and Port Facilities Projects | Power Generation Projects |
Power Generation Projects
Project: Electric Transmission Line Splice Project, Brisbane, CA
Conditions: Enclosed vault allowing no release of VOC’s, thus requiring minimal surface preparation (no sandblasting)
Objective: Permanent corrosion protection with minimal surface preparation and no VOC's to be released in confined vault
Solution: STACprime, STACfill, STACwrap performed by 2 men at 45 minutes per every 12' section
